
Homs, Syria
Since 1960 · reopens March 2027
- Floor
- 13,500 m²
- People
- 500
- Suits a month
- 20,000 fused, from March 2027
- Address
- QPQF+54, Hims, SyriaOpen in Maps
For other brands, in their own label
18,500 m² of floor across two plants, both working to the same specification.

Since 1960 · reopens March 2027

Opened 2022
28,000 suits a month with both plants open, from March 2027.
From Germany, Italy, Japan and the United States.






The Hajjo factory is at Street 13, Industrial City 1, Obour City, Cairo. It opened in 2022 and makes fused suits.
Yes. The Obour City plant can be visited by appointment. Write to [email protected] or call Ali Hajjo on +20 111 123 3208.
Obour City makes 8,000 fused suits a month, about 300 a day. With Homs open from March 2027, the two plants make 28,000 suits a month. By the end of 2027: 10,000 a month at Obour City and 30,000 at Homs.
Obour City has 5,000 m² of floor and 200 people. Homs has 13,500 m² and 500 people. Together that is 18,500 m² and 700 people, working to the same specification.
In March 2027. Homs, Syria, is where the family began in 1960. It reopens with 20,000 fused suits a month, about 770 a day, and a half canvas line and a full canvas line.
At Obour City: 45 Juki single needle lockstitch machines, Dürkopp Adler sleeve setting, buttonhole and pocket automats, AMF Reece pick stitch, and Rotondi fusing and pressing. Homs adds a Gerber automatic cutter, 110 Juki lockstitch machines and Macpi presses, with Strobel pad stitch machines on the half canvas and full canvas lines.
Send the tech pack with your inquiry. A sample follows within three weeks.
Or meet us at Cairo Fashion and Tex, 2 to 4 October 2026, Hall E6.